iOS publishing to AppStore remains disabled until Monday. We apologize for the delay. All systems are go but we’re working on creating disposable publishing instances on VM’s.
We’ve disabled iOS publishing to the App Store until Monday afternoon. We are working on creating disposable virtual machines to bypass instances that create leftover files. This is part of our SOC 2 Compliance audit.
Milestones
Actively coding
Completed Today
Working on addressing the disposable virtual machines for Iowa publishing to App Store
We're getting closer to completing Kelt. But we had to push the launch date out again. Today we did 7 different complex audits on our platform and discovered several things that still needed completion. Fortunately, our programmers are actively working through these tasks to completion and although we estimated November 7th, we're hoping to finish much sooner. Right now we're working on completing iOS store delivery, Android store delivery, Preview Performance, Website publishing, Data Center connectivity, and Android DL385 preview. It's all very complicated but we're getting there.
Milestones
The fact that we're just merging PR's at this point means that we're in the final stretch of orchestration.
Completed Today
It's hard to say. With 7 engineers working simultaneously on all fronts, we will report back once the dust settles.
Remaining Blockers
Just methodical and strategic merges of PR's.
Engineering Next
We'll provide more information at the end of the day.
Over the past 24 hours, we completed Fleet Gold V5 acceptance on all 20 M5 Macs (228/228 checks; 80 iOS slots) and DL385 Android r11 acceptance, then shut down and packed the Macs, DL385 and network gear for Monday’s Millennium Systems datacenter move. We passed PR #297 release review and PR #295 Store Delivery testing, merged PRs #293/#294, applied staging migration 0190, confirmed public signup remains locked, and advanced EFS security, Android KVM integration and production fleet registration plans. Final merges, activation and live acceptance remain pending.
Milestones
Completed Fleet Gold V5 acceptance: all six M5 Macs passed 228/228 checks, validating 24 iOS Preview slots.
Completed Today
Packed all six M5 Macs, DL385 server, and network equipment for Monday’s Millennium Systems datacenter installation.
Fixes & Improvements
Completed DL385 Android r11 acceptance and advanced bare-metal production scheduling and KVM security integration.
Remaining Blockers
Hardened Store Delivery worker passed 29/29 tests; production activation awaits final security validation.
Engineering Next
PR #297 passed release review; coordinated production deployment sequencing with Store Delivery PR #295
Engineering Notes
Merged PRs #293/#294, applied staging migration 0190, and advanced EFS isolation and production fleet registration.
Kelt made major progress toward production-ready iOS and Android previews. The M5 hosts was hardened, four isolated iOS preview slots were validated per M5, and M5-first/M4-fallback scheduling was added for our legacy M4 systems. Audits uncovered costly AWS/Vercel video routing, leading to a new datacenter-direct media design. The colo was confirmed to support 1 Gbps connectivity, low-cost bandwidth, inbound 443, scalable power, and the new HPE server will support owned Android compute.
Completed Today
M5 Golden Image and deployment to Dev Environment. Ordered the DL385 Dual 64-Core Server.
Today we met with Millennium Systems LLC to establish a working relationship for our Mac Studio M5 Systems. We initially benchmarked Mac Mini M4's but the return on investment wasn't adequate. They could only push 2 previews per M4 device. We upgraded to 18-core M5's with 64GB of RAM on our first 4 x Machines. But after testing we determined that our iOS previews were CPU heavy and that memory was nominal. Going forward, all of our additional M5's will be loaded with 18-Cores, 36GB of RAM, and 512GB of storage
Milestones
Worked on Engine Security, Android Preview through KVM using AWS until we get our 64 Core Epyc dual socket server.
Completed Today
Built our first Golden Image for our M5. Connected 10 x M5's via SSH for configuration.
Fixes & Improvements
Security isolation probe, tightened network configurations and prepared imaging.
Engineering Next
Moving equipment into the datacenter on Monday.