Launch Log

Kelt Forge
Launch Log

Daily progress, engineering milestones, and what's next.

Launch Readiness

iOS Publishing disabled

100%Complete

iOS publishing to AppStore remains disabled until Monday. We apologize for the delay. All systems are go but we’re working on creating disposable publishing instances on VM’s.

Launch Date
November 20, 2026
Last updated

Daily Engineering Log

  1. MilestonePinned

    iOS publishing to AppStore

    We’ve disabled iOS publishing to the App Store until Monday afternoon. We are working on creating disposable virtual machines to bypass instances that create leftover files. This is part of our SOC 2 Compliance audit.

    Milestones

    • Actively coding

    Completed Today

    • Working on addressing the disposable virtual machines for Iowa publishing to App Store

    Fixes & Improvements

    • Virtual disposable machine machines
    Kelt Engineering
    • iOS
    • publishing
    • VM
    • AppStore
    • Apple Developer
  2. MilestonePinned

    Audit Day and PR Crazy!

    We're getting closer to completing Kelt. But we had to push the launch date out again. Today we did 7 different complex audits on our platform and discovered several things that still needed completion. Fortunately, our programmers are actively working through these tasks to completion and although we estimated November 7th, we're hoping to finish much sooner. Right now we're working on completing iOS store delivery, Android store delivery, Preview Performance, Website publishing, Data Center connectivity, and Android DL385 preview. It's all very complicated but we're getting there.

    Milestones

    • The fact that we're just merging PR's at this point means that we're in the final stretch of orchestration.

    Completed Today

    • It's hard to say. With 7 engineers working simultaneously on all fronts, we will report back once the dust settles.

    Remaining Blockers

    • Just methodical and strategic merges of PR's.

    Engineering Next

    • We'll provide more information at the end of the day.
    Kelt Engineering
  3. MilestonePinned

    Data Center Preparation

    Over the past 24 hours, we completed Fleet Gold V5 acceptance on all 20 M5 Macs (228/228 checks; 80 iOS slots) and DL385 Android r11 acceptance, then shut down and packed the Macs, DL385 and network gear for Monday’s Millennium Systems datacenter move. We passed PR #297 release review and PR #295 Store Delivery testing, merged PRs #293/#294, applied staging migration 0190, confirmed public signup remains locked, and advanced EFS security, Android KVM integration and production fleet registration plans. Final merges, activation and live acceptance remain pending.

    Milestones

    • Completed Fleet Gold V5 acceptance: all six M5 Macs passed 228/228 checks, validating 24 iOS Preview slots.

    Completed Today

    • Packed all six M5 Macs, DL385 server, and network equipment for Monday’s Millennium Systems datacenter installation.

    Fixes & Improvements

    • Completed DL385 Android r11 acceptance and advanced bare-metal production scheduling and KVM security integration.

    Remaining Blockers

    • Hardened Store Delivery worker passed 29/29 tests; production activation awaits final security validation.

    Engineering Next

    • PR #297 passed release review; coordinated production deployment sequencing with Store Delivery PR #295

    Engineering Notes

    Merged PRs #293/#294, applied staging migration 0190, and advanced EFS isolation and production fleet registration.

    Kelt Engineering
  4. MilestonePinned

    M5 Day

    Kelt made major progress toward production-ready iOS and Android previews. The M5 hosts was hardened, four isolated iOS preview slots were validated per M5, and M5-first/M4-fallback scheduling was added for our legacy M4 systems. Audits uncovered costly AWS/Vercel video routing, leading to a new datacenter-direct media design. The colo was confirmed to support 1 Gbps connectivity, low-cost bandwidth, inbound 443, scalable power, and the new HPE server will support owned Android compute.

    Completed Today

    • M5 Golden Image and deployment to Dev Environment. Ordered the DL385 Dual 64-Core Server.

    Fixes & Improvements

    • Moved the previews off of AWS.
    Kelt Engineering
    • AWS
    • Previews
    • M5
    • iOS
    • Android
  5. MilestonePinned

    Millennium Systems LLC (Irvine Campus)

    Today we met with Millennium Systems LLC to establish a working relationship for our Mac Studio M5 Systems. We initially benchmarked Mac Mini M4's but the return on investment wasn't adequate. They could only push 2 previews per M4 device. We upgraded to 18-core M5's with 64GB of RAM on our first 4 x Machines. But after testing we determined that our iOS previews were CPU heavy and that memory was nominal. Going forward, all of our additional M5's will be loaded with 18-Cores, 36GB of RAM, and 512GB of storage

    Milestones

    • Worked on Engine Security, Android Preview through KVM using AWS until we get our 64 Core Epyc dual socket server.

    Completed Today

    • Built our first Golden Image for our M5. Connected 10 x M5's via SSH for configuration.

    Fixes & Improvements

    • Security isolation probe, tightened network configurations and prepared imaging.

    Engineering Next

    • Moving equipment into the datacenter on Monday.
    Kelt Engineering
    • datacenter
    • M5
    • MAC
    • Previews

Product Requests

What should Kelt
build next?

We're building Kelt Forge for people who want an AI developer that can actually build, deploy and manage real applications. Tell us what's missing from the tools you use today.

We use what you send only to plan Kelt Forge and, if useful, to follow up with you about it. We never publish or sell it. See our Privacy Policy.

01001011 01000101 01001100 01010100 01000110 01001111 01010010 01000111 01000101 01001011 01000101 01001100 01010100 01000110 01001111 01010010 01000111 01000101 01001011 01000101 01001100 01010100 01000110 01001111 01010010 01000111 01000101 01001011 01000101 01001100 01010100 01000110 01001111 01010010 01000111 01000101 01001011 01000101 01001100 01010100 01000110 01001111 01010010 01000111 01000101 01001011 01000101 01001100 01010100 01000110 01001111 01010010 01000111 01000101 01001011 01000101 01001100 01010100 01000110 01001111 01010010 01000111 01000101 01001011 01000101 01001100 01010100 01000110 01001111 01010010 01000111 01000101 01001011 01000101 01001100 01010100 01000110 01001111 01010010 01000111 01000101 01001011 01000101 01001100 01010100 01000110 01001111 01010010 01000111 01000101 01001011 01000101 01001100 01010100 01000110 01001111 01010010 01000111 01000101 01001011 01000101 01001100 01010100 01000110 01001111 01010010 01000111 01000101 01001011 01000101 01001100 01010100 01000110 01001111 01010010 01000111 01000101 01001011 01000101 01001100 01010100 01000110 01001111 01010010 01000111 01000101
Kelt Forge

An AI software engineer that reads your repository, runs the tests, and hands you a real commit.

© 2026 Kelt Agentic Systems, LLCplan · edit · verify · review